July 28, 2017

Shelf Layout Progress

In this week's work session, my friend and I got a chance to get the two boxes built-up. Most of the time was spent setting up the drill press to be able to correctly install the alignment pins.



Test fitting the 2x2 endplates; the holes and pins worked:


Added two holes for wiring, a third hole a 5/6" bolt, and finally a set of holes to allow for the modules to be cleanly separated:


Dry fitting and gluing the plywood tops in place:



Waiting for the glue to dry before the next session: